Sidewalk Pouring

As the house is nearing completion it is time to pour the sidewalk. After staking the sidewalk and driveway outline the concrete pouring was completed in one day. The excavated dirt was then pushed away to create a smooth grade. At a later time the front yard will be terraced with boulder walls. Check out the Sidewalk Gallery for pictures.

Guest Bathroom

Denise has always wanted a subway style bathroom so that was an obvious theme for the guest bathroom. The bathroom has a walk-in shower and a single sink cabinet. The wall paint color has a tint of grey and the trim color is grey to complement the black and white tile colors. Details are shown in the Guest Bathroom Gallery.