As the house is nearing completion it is time to pour the sidewalk. After staking the sidewalk and driveway outline the concrete pouring was completed in one day. The excavated dirt was then pushed away to create a smooth grade. At a later time the front yard will be terraced with boulder walls. Check out the Sidewalk Gallery for pictures.